Tuesday, July 1, 2008

Building a complex closet.

It shouldn't be this tough. I mean, it's a closet. But it's a freestanding closet that needs to be built before we can drop the rest of the ceiling, and it needs to coincide with the new HVAC ductwork running above the bathroom/laundry. (laundry north, bath to the south)

The duct work comes down about 10" from the joists on the East side of the room and covers the entire span from the North side all the way to the South side of the room, so we have to build the closet frames with 'cutout' areas.

We also have to build all three sides separately. The long wall (the North side- pink, green and blue panels in the plan below) will likely need to be built in three sections, because the extension of the closet to the West is the framing for the doorway into this laundry area.



The other two sections, the east (yellow) and the south wall (bottom blue), shouldn't be too much trouble as they'll both be one piece wall units... but sheesh, the North wall's gonna be a b*tch, particularly because of where the adjoining pieces connect. The first is in the middle of the closet door, so that needs reinforced.

I'm thinking we build the door frame area first, then the wanky ductwork wall, then fill the spaces in between with what we've been calling "ladders". This way we can put the easiest piece in last and make sure it fits on both sides.

Oh, yeah, the floor's not level either. It slopes to the east, so we're making sure the closet door opening will have to be measured particularly well, and capped on the underside of the top opening with an additional 2x4 so we can shim it to ensure it's level. This entails making the closet door opening an additional 1.5" tall to start with, but I think the additional bracing will be helpful in joining our various walls together as well.

If this sounds confusing, imagine what it feels like in my head. Then we get to figure out how to frame in & drop the ceiling to match the ductwork height.

Ugh.

This last picture is looking through the South framing wall of the bathroom toward the North.

Hello, ducts.


Day-After Notes from Mark: H is really like this. She draws out everything given a chance. It actually really helps keep us on the same page. We discovered one wrinkle, however. That drawing is about 3.5" off on the hallway to the west of the closet. Basically, we're not going to be able to run that North wall as one continuous span from east to west. We're going to have to build out the door jam 3.5" north. A clumsy miscalculation while framing weeks back now requires and elegant bit of problem solving.

A few walls are built and leaning up out of the way. We ought to be able to finish this one today or tomorrow. We'll get pics up of the "elegant solution" when it's up.

More paint decisions


I've tried to determine the paint layout on the decorative corbels under the front boxgutter. Thinking that they're only going to be seen from three stories below, I didn't want them to look too cluttered, but couldn't pass the opportunity to add some color.

We've decided on the pewter base, the green (main house paint color) for shadow, and a burgundy accent.

I hope it doesn't suck, because the painters told me I'm not allowed to make any more changes.

Thursday, June 26, 2008

Two New Additions to the Blogroll

I picked up two new additions to the Blogroll.

The first This Reluctant Soil is pretty new, and has more to do with building a fine urban garden, but in looking at their slide show, they also did a rather extensive renovation. I'm hoping that they find motivation to blog about the story of their renovation. In any case, a garden should be part of any urban reno, so this one is in. I like their style.

The next blog addition is Remodeling for Geeks . This one is a must-read for the DIY renovator and rehabber. I've gotten some good stuff from there already.


There you have them. Check 'em out!

Sunday, June 22, 2008

I love my in-laws.

I know, not something you hear everyday, but if anyone has earned it, they are my mother-in-law and my father-in-law. Simply put, they rock.

Background info: I have one of those obnoxious birthdays that is perfectly seated in the U.S. holidays so that it is overshadowed and ultimately banished to the back corner of the room behind all of the Christmas wrapping paper, Hannukah socks and New Year's Eve travel plans. Been like that my whole life... until I met my hubby.

Hubby decided that I should have a birthday away from the chaos of December, and so he moved it six months away from all of the extracurricular fuss. We've been celebrating my half-birthday for seven years now, and I'm kinda beginning to like having a birthday again. Who knew these things could actually be 'fun'?

OK, so back to the in-laws: Total buy-in for the halfsies B-day thing. The whole shebang. Bells, whistles, and wrapping paper. So yesterday, hubby let me sleep in to past 9AM. When I finally climbed out of bed, dragging my sore bod down to the living room, there in the middle of the floor is a large golden wrapped box. (Apparently the folks came over early and dropped it off, cuz I know it wasn't there the night before.)

"Can I open it?... It's not my 1/2B until Tuesday..."
"Sure. Mom and Dad brought it over because they're going out of town and wanted you to have it early."

Not being one of those kinds of adults who delicately slides open the taped joints of the shimy paper and unfold each corner of wrapping paper, as if to say, 'gee, I'm really over budget on the rehab, I may need this to re-wrap a gift for Mom on her next birthday, I wonder if she'll notice it's the same paper'.... I dove into the wrapping paper like Mark Spitz into water. (That just doesn't sound the same out loud as it formed in my head, you know?)

Afterward, I called up my in-laws to thank them for the generous gift. My mother-n-law answered the phone:

Me: "Thank you so much... you absolutly rock!"
Mom: "WHAT?! You OPENED it??! It's not your birthday until TUESDAY!"
Me: "B-b-b-but, I thought that. . . . [hubby] said that I could . . . . I I I I ...."

To which, after a moment of strained silence, was met with uproarious laughter on the other end of the phone as my father-in-law off in the kitchen loses it.

They got me.

They also got me just what I wanted.
I tell ya, these kids UNDERSTAND a daughter-in-law. They really do.







Thanks, you two. ;-)

Shout Out to Bob--Top Tapcon Taskmaster

Bob Carlisle deserves another "atta". We ran out of the masonry fasteners that we use to fur our exterior walls and otherwise attach stuff to brick. It was Tuesday evening and we're under the gun to get the place furred out for the electrician.

We then forgot to order new fasteners until late Wednesday. H made her order with Confast.com again. They cost about 33% less than the big box hardware stores charge--including shipping. THURSDAY afternoon they were waiting for us. That was less than 24 hours turn around, AND it saved us good money. Oh and they throw in the bits too.

If you need Tapcons, go to Confast.com.

Here's a video of Bob showing you how to use Tapcons. "Atta" boy, Bob!

Friday, June 20, 2008

Picking the paint colors- exterior


We've settled on a paint pallet.

We've been picking up paint swatches for months now. We knew we wanted to go with a sage-greenish color and sandstone colored trim, but you'd be amazed at what that range actually turns out to be, and how many of the colors we *thought* we'd love actually turned out to look like baby poop or just sickly.

So we gave up on swatches. No matter what we looked at in a small patch just didn't work out (look right ) on a larger scale. We know because we would go up to a house that we thought was just awful, compare a swatch, and of course it would turn out to be one of our top three choices.

Lesson: Learn from the mistakes of others.
Corollary: Imitate the successes of others.

While driving around, looking at corbels, cornices and whatnots, I yelled out "stop the car!" and there it was. The perfect paint color, the perfect trim... the house was similarly aged and brick.... and these people had class.

We knocked on their door and a wonderful woman answered and we talked about the paint job on the house and where the paints came from (turned out to ber ICI paints here in Covington- they manufacture paints for Glidden, Dulux, etc.) I was desperate to know what the exact colors were, so I gave her our card and hoped she'd find out when her husband returned.

Not to let it go, but I did a google search the next day and found out their phone number from their address. I called, apologetically for being so intrusive, and left a message.

Minutes passed.

The phone rang.

You'll never guess what the husband did for a living.... Yup, he was a house painter. (Now a custom metal worker.. helooo wrought iron fence...) In any case he spoke with my hubby and yes, he knew not only where the paint was from, but it was a custom color and he still had the specific numbers (recipe) and now it's ours!!! (Thank you Kimberly and Dan!!)

It's perfect! (see above)

And below is a rudimentary approximation of the colors & placement for ours: (I hope it ends up looking a lot more like his that this picture!) But you get the general idea.


It's such a relief knowing such a major decision is behind us.

Thursday, June 19, 2008

Bathroom tiling- followup.

So we finished the first floor bathroom tile. We picked up some nice looking marble at Surplus Warehouse and installed it using the very same method you will see on any DIY website/blog.TV show/DVD, etc. Using dry (water added) Thinset, 1/2" square notched trowel, a rented tile saw, (which we forgot to return for 2 days! Doh!) a red wax pencil (for marking darker tiles) and a measuring tape.

The only thing I would suggest that we didn't do, is fully cut and layout ALL of the tiles BEFORE you mix the thinset. We laid them all out on the livingroon floor the day before, and prepared which ones would go where, but we started installing the tiles thinking that since we only had eight to cut, and they would all be straight cuts, that the following day I could start setting them in thinset, and install the last ones as they were cut.

I thought we had a pretty good bead on the layout only to get stymied mid-stride by having NOT included the extra space for the threshold. This meant some additional unexpected cuts. A quick reconfigure and a good 20 minutes later, I noticed that the tiles already installed set up pretty quick with the thinset.

Some of the tiles that were put in later than the first ones , turned out to be about 1/16" higher at the edges. Now probably only I will notice it, and only if I'm barefooted, but it's something to consider before you get started. The point is, if you lay them all out with the thinset in one big batch, you can level them all together and probably get a much better job.

Now that we've got a better idea of how to set tile down, on our most recent trip to Home Depot we came across some cheap 12x12" tile (about $1/sq foot) and picked it up for the 3rd floor guest bathroom. Those suckers have 15 tiles in each package and they are HEAVY.

We got four. They haven't made it to the third floor yet. We're working on it.

Today we screwed down the 1/4" OSB down on the second floor bathroom, and are almost ready to put the Hardibacker down. I think we'll be waiting a while before we actually get the tile down on that floor.

Attention: Completely unrelated rant warning: woot woot woot.

So, another long day under our toolbelts, and I apologize in advance for the crabbiness, but, both Hubby and I start work in the office at 6:45AM. In the afternoons we get to the site and work as much as we can. Then about 7 PM, we head back home to finish up more office work. We usually get to eating dinner at about 9 or 10PM, watch a Netflix, and head off to bed at about 12:30. Then we start the same routine all over again, six days a week. On the seventh, well, you know.

So anyway, we sometimes find ourselves at the local grocery store rustling up some grub for dinner before heading home. Yesterday evening was one of those nights and I still had my camera in the car.

We pulled into the parking spot and found the grocery cart just sitting there in the space. That peeves me in the first place because it's MY car that gets hit by the darn thing after someone ELSE leaves it there. I mean, just how much energy does one person need to expend to roll (not carry on your back or anything) but ROLL it over to the cart receptacle area where they WON'T roll out and hit anyone else's car.

How lazy and obnoxious do you have to be to NOT push the cart the five feet away to the cart collection area? It was right there!!!

No matter how tired we are at the end of the day, we put our carts back where they won't damage anyone else's car. I consider it a courtesy, if not an obligation.

So whoever you are, lazy cart person, I hope one day you leave your cart behind in the parking space and I hope it chases you down and dings your door on your way out of the lot.
So there.

Wednesday, June 18, 2008

What happens when you use the wrong mortar on brick

Hubby previously mentioned 'spalling' of brick caused by using a mortar mix that was too hard for the bricks to expand and contract, causing the surface of the brick to shatter, and eventually disintegrate. I took some photos of our brick and of a brick house built within 6 months of our home in the same neighborhood.

Ok, kids, let's play 'Bad Mason/Good Mason'.

Bad Mason:













Up at the top of this wall, the sparrows have dug small nests into the brick where they've dug out the soft brick.














Below: good Mason: Puuuuuurdy brick. :-)

Ibuprofin, and lots of it.

I've been the 10" circular saw maven of the house since this project began. It's my saw, and I use it about 90% of the time.

But it's an old saw. A Makita from 1995ish, I believe. And heavy. I used to use the saw all the time and never had any problems before, but now as I cut into my 400th or so 2x4, my right elbow is just plain sore.

Hubby tells me it's tennis elbow.

Yesterday, I set the saw on top of our makeshift OSB table as we finished furring out the second floor 'office' (yeah, one more room done!) and bumped into a 2x4 that knocked the saw off of the table. In a split second, I quickly reached out and grabbed the saw mid air 2' from the ground, saving the saw from certain death, and most definitely totally wrenching my elbow in rather excruciating pain.

I'm researching how to crush up ibuprofen in a sterile solution so I can IV the concoction straight into the elbow. They seem to be all out of morphine at the Krogers Rx.

Moral of the story: learn to share your toys more with your spouse.

Monday, June 16, 2008

Pointing Up and Mixing Mortar

Old brick is soft. We have old brick. We are repainting, so any pointing that should be done needs to be done now. Because the brick is so soft, we cannot use standard, "Type N" Mortar. It won't give and when the brick expands and contracts or takes on water, the mortar will hold fast and brick will spall. So, we need a more historically appropriate mortar, like "Type O" or even "Type K"

"Type N" mortar (i.e. what Quikrete sells as Mortar) should consist of six cups of sand, one cup of lime and one cup of Portland. A "Type O" mortar should consist of 2 1/4 to 3 times as many cups of sand as portland and lime. "Type O" should have 1.25-2.5 times as much lime as portland. "Type K" should have 2.5-4 times as much lime as cement.

What I did was take 2 cups of "type N" mortar and added 1 cup of lime and 3 cups of sand (of a fairly coarse and thus similar to original variety) to the mortar. Then, to toughen it up just a tad, I add another 1/2 cup of portland, or perhaps a bit less. So I end up with:

3/4 cup portland
1 1/4 cups lime
4 1/2 cups of sand

IMPORTANT ADDENDUM:

After doing more research, we've found that you can use lime in much greater quantities if it is finer. Not only that, but it's both easier to work with AND plenty tough. We also found that we were using WAY TOO MUCH PORTLAND. Fortunately, it was just shallow pointing and protected from water. The key thing to remember is no more than 20% portland to portland+lime.

Here's the recipe I used much later when replacing bricks:

1 part Type N Mortar
2 1/2 parts Lime
5 parts sand

We also added a teaspoon of putty colored dye. This makes the mortar almost invisible next to many older mortars. You can use a little less lime or a little less sand just watch that ratio of portland to lime.

More portland adds strength, but loses flexibility. There's a delicate balance. Too hard, and you damage your brick or worse. Too soft and you'll be doing the whole process again soon. I probably could have skipped the additional portland but I fear that it would take far too long for this relatively weak "type K" mortar to set up and we need to paint soon.

I'm pre-mixing the dry ingredients first, and keeping them in a left over kitty litter bucket with a lid. Then the painter can take out what he needs, add water to that, slake, and then go to town.

I did a test and with the larger, browner sand and the lime, this looks almost identical to what I have in there from 100 years ago. Not bad. Of course, the proof is in the pudding. We'll see how it looks prior to paint and after.

If you try to do this yourself, you'll want to read up on technique and get a few tools, but from what I've seen, getting the recipe down is probably the toughest part.














Below are pictures of the mortar only a few hours after application. The image above was of the same mortar mix, but which has cured for 24 hours.














Sunday, June 15, 2008

Anniversary

Yesterday was our 5th wedding anniversary.

We celebrated it with a bit of furring, then champagne, and a roast hen with garlic scapes. For those of you not yet hip to these, they are the un-opened flowers and tender stalks of the garlic plant. In order for garlic to bulb up properly, the scapes must be cut. Fortunately, they are ambrosia for garlic lovers. We blanch them, then sauté briefly in butter. Really, not a bad way to celebrate a great day.

We didn't exchange gifts since we already had the traditional gift for this anniversary...

(wait for it...)




WOOD!

Thursday, June 12, 2008

Hub-tard

That's my term for myself when I put being funny ahead of making nice to wife.

For instance, we tend to forget things when we get this busy, so we like to leave little notes around the office to each other on the white board. My brain must not have been working.

The other day, wife was already running late and when she started the coffee she forgot to turn on the gas burner to heat the water in the coffee pot. I followed up to finish the coffee and found cold water. I thought it was funny so I left wife a cute little note as a reminder.

She reciprocated.



Hub-tard.